Raday renovation pt. IV. – Living room

December 6th, 2010 |

A panorama from the 13th week again, this was made from the doorstep to the living room. There you can see our brand new front door, it has only 2 plies of ground coat. We will paint all the windows and doors next spring so we delayed the painting of this also to get the same colour for all the wooden seals.

radaystreet/week13_pano2
View the panorama in immersive mode
  ›  2,094 kbytes (2.05 Mbytes)

Read More »

Raday renovation pt. IV. – Loft

December 4th, 2010 |

This was taken on the 13th week of the renovation. As you can see, the loft is almost ready, only the arc is incomplete. In the next week the walls get painted white, and the LED lights will be mounted.

radaystreet/week13_pano1
View the panorama in immersive mode
  ›  1,996 kbytes (1.95 Mbytes)

Read More »

Raday renovation pt. II. – living room

November 14th, 2010 |

This panorama is also pretty old, it comes also from the 3rd week of the renovation. This will be our two-storey living room, respectively there will be the bedroom upstairs. In the corner where you can see the ladder leaned towards the wall, there will be a nice stairs and the upper slab becomes a light, soft arc. I can’t wait to move in again, hopefully they will finish it in december, before christmas. Look for the other panoramas in the “Raday_street” category, there must be some newer panoramas about the renovation!

radaystreet/week3_pano3
View the panorama in immersive mode
  ›  2,549 kbytes (2.49 Mbytes)

Read More »

Raday renovation pt. III.

November 5th, 2010 |

By the ninth week, the windows were already there, the door to the bathroom was also installed, and the slab of the bathroom is finished. Down under you can see the frame of the stairway half-way readied. The bedroom will be separated from the hall by glass bricks. The whole flat was designed entirely by my girlfriend, she also coordinates the construction and the procurement.

radaystreet/week9_pano1
View the panorama in immersive mode
  ›  1,963 kbytes (1.92 Mbytes)

Read More »

Raday renovation pt. II.

October 3rd, 2010 |

This is the very first panorama made at the newly established gallery. This is only the framing, it will be covered with MDF boards and parquet.

radaystreet/week3_pano1
View the panorama in immersive mode
  ›  2,096 kbytes (2.05 Mbytes)

Read More »

Raday renovation pt. I.

September 18th, 2010 |

This was made right before breaching the wall between the pantry and the living room. More pictures/panoramas are to come!

radaystreet/raday_renovation_pt1
View the panorama in immersive mode
  ›  2,673 kbytes (2.61 Mbytes)

Read More »