Raday renovation pt. IV. – Loft
This was taken on the 13th week of the renovation. As you can see, the loft is almost ready, only the arc is incomplete. In the next week the walls get painted white, and the LED lights will be mounted.

View the panorama in immersive mode › 1,996 kbytes (1.95 Mbytes)
The boards for the stairs will be finished later, it will be made of walnut, the timbers for it are currently in the dehydrator. Look back on moday, there comes another panorama!


good luck with the renovation! I made myself exactly as you some panoramas of flat during renovation. But that I am on begining.
Thanks! Actually, we’ve almost finished with it, only the kitchen left but it is postponed to this summer. I am planning to take some VR shots about the finished state.