Raday renovation pt. II. – living room

November 14th, 2010 |

This panorama is also pretty old, it comes also from the 3rd week of the renovation. This will be our two-storey living room, respectively there will be the bedroom upstairs. In the corner where you can see the ladder leaned towards the wall, there will be a nice stairs and the upper slab becomes a light, soft arc. I can’t wait to move in again, hopefully they will finish it in december, before christmas. Look for the other panoramas in the “Raday_street” category, there must be some newer panoramas about the renovation!

radaystreet/week3_pano3
View the panorama in immersive mode
  ›  2,549 kbytes (2.49 Mbytes)

Read More »

Raday renovation pt. II. – kitchen

November 10th, 2010 |

This panorama is about a month old, it was made on the 3rd week of the renovation. As you can see, our kitchen was by that time pretty crushed. It was the initial stage of welding the steel frame together. There will be a bathroom upstairs, the door up there will lead to the bedroom.

radaystreet/week3_pano2
View the panorama in immersive mode
  ›  2,103 kbytes (2.05 Mbytes)

Read More »

Raday renovation pt. III.

November 5th, 2010 |

By the ninth week, the windows were already there, the door to the bathroom was also installed, and the slab of the bathroom is finished. Down under you can see the frame of the stairway half-way readied. The bedroom will be separated from the hall by glass bricks. The whole flat was designed entirely by my girlfriend, she also coordinates the construction and the procurement.

radaystreet/week9_pano1
View the panorama in immersive mode
  ›  1,963 kbytes (1.92 Mbytes)

Read More »